• EDEN Transformers in Chennai

    We are performing Upto 500MVA

    765/400KV class Transformers

    Erecting, Testing Commissioning, Oil filtration, Overhauling, Fault analysis works of all type / application transformer such as ICT / GT / UAT / ST having ratings 2MVA to 500MVA and 11KV to 765KV of various brands such as BHEL, HHE, NGEF, CGL, TELK, GEC, ABB etc to all over India.

  • EDEN Transformers in Chennai

    EDEN Transformers in Chennai

    Transformer Service & Maintenance Activities



    Analyze what is wrong with your transformer and repair those issues whether it be Earthing problem, coil winding problem, etc. This is performed at on-site also.

  • EDEN Transformers in Chennai

    EDEN Transformers in Chennai

    Transformers Movement Activities



    We load your transformer from the factory and unload it in
    your site. Not only that, we also take care of erection, testing
    and commissioning and every other process to handover
    a complete transformer that is ready to be charged to you.

Quality Services

Acceptance Testing, Commissioning and Startup, Preventative Maintenance Testing

Valuable Ideas

Startup and Commissioning, Integrated System Testing, Facility Operation and Maintenance

Budget Friendly

Intelligent Electronic devices & Graphical user Interface to simplify & have fast Data monitoring

Suport 24/7

Highly qualified technicians and engineers in the business, which in turn delivers good value to our customers

WHO WE ARE

We, at EDEN Transformers are highly committed to providing our clients with the best Transformer services such as Repair & Maintenance, Erection, Testing & Commissioning, Supply of Spares, Oil filtration, Oil Leakage Arresting (Cold Welding Works), Overhauling, Fault analysis works of all type / application transformer such as ICT / GT / UAT / ST having ratings upto 500MVA and 11KV to 765KV of various brands such as BHEL, HHE, NGEF, CGL, TELK, GEC, ABB etc to all over India.

Our Team

We are a team of Engineers specialized in Transformer Services with over 10 years of experience including 5 years from AL-AHLEIA SWITCHGEAR CO, Kuwait, An International Transformer Manufacturing Company.

Our Quality Policy

We have devoted ourselves to meet the expectations of our clients and to satisfy them with our High-Quality Services at a reasonable price. With our thirst for innovation, we strive for continuous improvements in our services while adhering to the latest international standards with on-time delivery which has rewarded us an ideal identity in the market.

Recent Projects

Bharat Heavy Electricals Ltd
Bharat Heavy Electricals Ltd

Location: 400/110kV TANTRANSCO Substation at K R Thoppur, Salem

Project Details: 200MVA, 400/110/33 kV ICT Transformer Overhauling Work

  • 400kV Bushing Replacement
  • Testing & Commissioning work
  • Oil Draining & Hot Oil Circulation
KEC International Ltd
KEC International Ltd

Location: 765/400kV ICTs at North Chennai Pooling Station, Edayanchavadi.

Project Details: 765/400kV class 500MVA ICT Erection ,Testing and Commissioning Work

Ashok Leyland Limited
Ashok Leyland Limited

Location: Foundry Division, Sriperumbudur, Kanchipuram.

Project Details: 5750KVA Transformer Oil Leak Arresting

  • 5000Ltrs Transformer Oil Filtration
  • Transformer Gasket Replacement
  • Transformer Testing
Tamilnadu Transmission Corporation Limited
Tamilnadu Transmission Corporation Limited

Location: 230/110KV Echangadu SS, Trichy

Project Details: 80MVA “TELK” make Auto Transformer OLTC Repair

  • Oil Draining, Filling & Hot Oil Circulation
Apollo Tyres Ltd
Apollo Tyres Ltd

Location: Chittoor, Andhra Pradesh.

Project Details: Power TR Aircell Commissioning Work

BGR Energy Systems Limited
BGR Energy Systems Limited

Location:1X660MW SETPS Expansion Project, Ennore, Chennai.

Project Details: 10 Numbers of 11KV/433V Transformer Overhauling Work, DP Yard Earthing & Painting works Transformer Rating: 250KVA, 500KVA, 630KVA, 950KVA

CG Power & Industrial Solutions Limited (CGL)
CG Power & Industrial Solutions Limited (CGL)

Location: Taqa Neyveli Power Company Private Limited

Project Details: 290 MVA, 240KV/18KV CGPISL make Generator Transformer Oil Leakage Arresting and Gasket replacement activity was completed

Sterling & Wilson Pvt Ltd
Sterling & Wilson Pvt Ltd

Location: Railway Electrification GR – 294 Project, Karnataka

Project Details: Complete Erection, Testing, Commissioning and Oil Filtration of 2 numbers of 66/27kV & 21.6/30.24 MVA Single Phase Power Transformers work completed successfully.

Sembcorp Industries Ltd
Sembcorp Industries Ltd

Location: Green Infra Wind Energy Limited, Karnataka

Project Details: 2.25MVATransformer Overhauling Work

  • Oil Leakage Arresting
  • 1850 Ltrs Transformers Oil filtration
Saint-Gobain India Private Limited
Saint-Gobain India Private Limited

Location: Sriperumbudur, Kanchipuram.

Project Details: Earth Pit Installation, Painting and Testing Work Electrical Installation Services

Nayatech Engineering Services
Nayatech Engineering Services

Location: Bomdila, Kalaktang & Tawang in Arunachal Pradesh

Project Details: 18 Numbers of 5MVA Transformer Erection, Oil Filtration work

Suryadev Alloys and Power Private Limited
Suryadev Alloys and Power Private Limited

Location: Gummidipoondi, Thiruvallur.

Project Details: Oil Filtration Vacuum processing work.

S S Electronics & Systems
S S Electronics & Systems

Location: Avighna Solar Farms Limited, Iskilla Village, Telangana

Project Details: Construction of Earth pits at 16 MWp Grid tied Solar Power Plant project

MRF Limited
MRF Limited

Location: Tiruvottiyur, Chennai.

Project Details: 1600KVA, 1000 KVA, 750KVA Transformers General Maintenance and Painting work

CG Power & Industrial Solutions Limited (CGL)
CG Power & Industrial Solutions Limited (CGL)

Location: South Region – Tamilnadu, Karnataka, Andhra Pradesh, Kerala

Project Details: Commissioning, Repairing & Servicing the products & equipments of CGPISL

Our Projects

We are the leaders

Transformer Service & Maintenance Activities

On-Site Services

Transformers Repair and Service

We inspect your transformer and analyze what is wrong with your transformer and repair those issues whether it be Earthing problem, coil winding problem, etc. This is performed at on-site also.

Testing and Commissioning

We perform the complete Testing and commissioning process right from Erection, Performing all types of Transformer Testing (including TANDELTA.SFRA) giving clearance for charging the Transformer and do the commissioning. We take utmost care and precautions duly following all standard instructions when it comes to satisfying your needs.

Transformers Installation and Maintenance

From bringing the transformer to Site, performing erection and connecting them properly, we also do maintenance checks to confirm that the transformer works perfectly. We also do yearly maintenance check in line with standard Maintenance protocols and give a report about the performance and quality of the transformer to the customer.

Spare Parts Supply and Replacement Work

We supply all sorts of accessories required for the transformers like MOG, OSR, and Breather and so on. We also perform replacement for damaged spare parts on-site.

Gasket Replacements and Overhauling Work

We change the complete gaskets and submit a detailed report on the status of the quality of accessories such as Bucholtz relay, Oil Surge Relay, MOG, Breather, checking Winding and Oil Thermometers and the capacity check, just like an installation process. We also perform Oil circulation works if required.

Oil Filtration, Circulation and Reconditioning

When the IR Value of the transformer is very low, then this Service comes in handy. We perform Oil Filtration and Circulation to increase the IR Value of the transformer. When the Oil IR Value turns very low, then Reconditioning of Oil is done.We have 10KL filtration machine, high quality Vacuum Pot, Dry air units and 30KL Oil storage tank to successfully execute the process.

Online leak arresting with Epoxy application

If a gasket cannot be replaced, or due to a continuous process, the transformer cannot be shut down, then this online leak arrest comes in handy. This is a special service which we provide for you at a critical situation where your work load doesn't allow you to stop your process.

Annual Maintenance

We Perform Annual Maintenance by performing Physical Inspection of Transformer, Oil test, Transformer Routine test etc, Quarterly Monitoring and submit a report on the same.The Health of the Transformer and Capacity Utilization is ensured.

OLTC Spare Parts Supply and Replacement

We are specialized in OLTC Products . OLTC servicing includes cleaning of contacts, Oil Sludge removal, adjustments of springs, checking of motor drive operation. We provide all the critical spares and can also do replacement work for OFF load and ON load Tap changers. We have an engineer in our team who is a former employee of Easun MR Tap Changers Ltd. Hence, giving you a promising satisfaction for the best OLTC service you could have.

Transformers Movement Activities

Whenever you order a transformer from a Manufacturing Factory, Just entrust the job of transportation to us. We load your transformer from the factory and unload it in your site. Not only that, we also take care of erection, testing and commissioning and every other process to handover a complete transformer that is ready to be charged to you. We also submit a complete report of all activities and Test results to you. We perform this to all Transformers up to 400KV Rating.

Request a Free
Call Back

Provide discussion information and we’ll get back to
you as soon as possible

Client Testimonial

What our clients says?

CG Power & Industrial Solutions LtdMr.R.Ravigandh Santhosh

We hereby certify that M/s. EDEN TRANSFORMERS, has completed the Oil leakage and Gasket replacement activity in 290 MVA, 240KV/18KV CGPISL make GENERATOR TRANSFORMER at Taqa Neyveli Power Company Private Limited with utmost customer satisfaction.

Bharat Heavy Electricals LimitedDipak Kumar Mandal

M/s EDEN TRANSFORMERS has successfully supplied / executed Replacement of existing 400kV Bushing in 200MVA, 400/110/33 kV ICT Transformer by new 400kV Bushing with testing and commissioning of Transformer.

Sterling & Wilson Pvt LtdVangal R Sudarsan

M/s EDEN TRANSFORMERS has successfully completed the ETC of 2 numbers of 66/27kV & 21.6/30.24 MVA Single Phase Power Transformers works at ENRICH SWPL # JV, Karnataka as per our Technical Specification and Terms & Condition with utmost customer satisfaction.

S S Electronics and SystemsS. Siddharth

M/s EDEN TRANSFORMERS represented by Shri.V.Arunbernatsha executed the Construction of Earth pits at 16 MWp Grid tied Solar Power Plant project, Iskilla Village, Telangana Service Order with accuracy and their performance was Satisfactory.

Vedanta Limited Aluminium and PowerAjit Kumar Shah

Mr.Arun Bernatsha has successfully completed the job of inspection/overhauling/oil filtration of 3 No’s of complete transformer (2.0 MVA, 33000/433V, Distribution Transformer) and 5 No’s of Transformer OLTC of Vedanta Township substation, at Jharsuguda location. He is well versed with inspection of all parts of transformer and its repair/overhauling. During inspection work he has carried out repair, leakage arrest and replacement of defective part found during inspection and overhauling job.

Bharat Aluminium Company Ltd.Avinash Pandit Chavan

Mr.Arun Bernatsha has successfully completed the job of internal inspection/overhauling/oil filtration of 10 no’s of 144MVA of Rectifier System (Regulating & Rectifier Transformers).